Fast, Ergonomic, Cost-Effective, Millimetric, and Safe Handling
The advanced hand control unit maximizes human-machine integration during handling processes.
Simplify your operations
with servo technology.
The system detects the operator’s movement intent, allowing them to transfer loads in a weightless environment with millimetric precision.
Up to 600 kg Capacity
Experience the feeling of handling loads in a weightless environment
Float Mode
Control the handling from either the material or the control unit
Millimetric Precision
Millimetric point verification with encoder technology
Uninterrupted Operation
Heavy-duty construction with high thermal stability for intensive use
Jib Cranes
Explore the installation methods best suited to your site conditions and operational needs.
There are 4 different application methods available to perfectly adapt to the production and logistics activities in your business.
Floor
Anchored
Offering a 350° rotation, this option features an adjustable column height based on your needs, providing the flexibility to access multiple points.
Wall
Mounted
To prevent interfering with workflows in confined areas, the crane system is installed directly on the wall surface, seamlessly adapting to your business processes.
Plate
Mounted
In this method, the 80 kg jib crane can be easily transported by forklift to whichever location your operation requires.
Rail
Mounted
Installation is performed on existing or newly built aluminum ceiling rails. This allows a single handling system to be utilized across wide areas.
Lower energy consumption
and maintenance costs.
The new standard
of smart handling
in the industry.
In today’s market, where industry dynamics change rapidly and lean production comes to the forefront, modernize your handling processes to make your business far more flexible, durable, and future-ready.
Maximum Ergonomic Handling
It reduces your waiting times by accelerating handling operations carried out with conventional cranes or manual labor up to 4 times. It improves your handling efficiency by easing the power and resources your operators expend for handling operations.
Handling Optimization
Energy & Operating Cost Savings
Consuming just 0.8 kW to 1.6 kW, the system uses as little energy per lifting cycle as charging a smartphone. With a routine periodic maintenance that takes only 1/2 hour once a year, it stays up and running without causing any downtime.
Maximum Safety Measures
It operates 34% quieter, prevents work accidents through smooth and vibration-free handling, and eliminates the risk of dropping by holding its position when the load is released. It also prevents health issues for operators.
Continuous & Efficient Operation
With minimal service requirements, it reduces operational downtime by 95%. It requires no calibration during transitions between different loads, and maintains peak operating efficiency permanently without overheating, even under intensive use.
Get a closer look.
Discover our engineering solutions designed to adapt perfectly to your field dynamics and specific production processes; optimize your operational efficiency and take your competitive edge in the market to the highest level.
00%
Multiply efficiency by optimizing
your handling processes from
the very first month.
Fill out the form to request our catalog and explore the technical specifications, advantages, technology, and installation methods of our smart handling systems up close.
With smart handling systems
scale up your capacity.
Go beyond conventional systems: Enhance your business’s digital transformation and operational power with smart crane technologies.
Need support with investment planning?
Conventional Cranes
Electric-Driven & Pneumatic
- Millimetric Precision & Smooth Handling
- Float Mode – Control by Holding the Load
- Active Torque Control & Infinitely Variable Speed
- Real-Time Load Notification & Virtual Safety Limits
- Process Automation Integration
with Servo Motors
Next-Generation Smart Cranes
- Millimetric Precision & Smooth Handling
- Float Mode – Control by Holding the Load
- Active Torque Control & Infinitely Variable Speed
- Real-Time Load Notification & Virtual Safety Limits
- Process Automation Integration
Frequently Asked Questions
Why is the maximum load capacity 600 kg?
As the load weight increases, so does inertia, requiring machine power to drive movement in the X and Z axes alongside the operator's manual control.
Is lifting performed only with a hook?
Custom-designed attachments, including material-specific pneumatic, electric, or mechanical gripping devices (end effectors), are custom-built for every application.
What is float mode?
This feature allows the operator to execute multi-directional handling operations by simply guiding the material itself, without touching the crane control handle.
Will the load drop if the crane is released?
The electromagnetic braking system continuously balances the load every second—even before the control handle, pendant, or load is released. Consequently, the load remains suspended in mid-air.
Industry
solutions.
Through our custom-configured material handling systems, we are dedicated to boosting your operational efficiency and helping you reach your strategic objectives.
Our success stories
Hear from our business partners
"We implemented Gauss smart servo systems to prevent operator fatigue on our lines. Thanks to the zero-gravity movement technology, heavy loads are now handled with zero effort. This ergonomic comfort has reduced medical leave reports while increasing our shift efficiency and quality. We are extremely satisfied with this technology that protects employee health."
Elki Cable
Production Supervisor
"Thanks to our new handling system, we don't make any adjustments during different load transitions. The system automatically detects every weight. With zero downtime and minimum maintenance needs, our production lines no longer wait for each other. This seamless flow and flexibility allow us to fulfill our orders easily and always just in time."
Batel Elektromekanik
Maintenance Manager
"We switched to Gauss crane solutions to speed up our logistics and handling processes. Thanks to the high handling speed and short cycle times, we have completely eliminated time losses and bottlenecks on our lines. We are extremely satisfied with this investment, which directly increased our production output through its serial operation capability."
Gürel Marble
Operations Chief
Technical publications.
Ergonomics Meets Efficiency: Reducing Physical Strain by 90%<br/><br/>
The primary bottleneck in manufacturing setups is rarely machine cycle time; it...
Plant Layout Design Guide: Knuckle Boom Jib vs. XY Rail System<br/>
The single greatest error in assembly line planning is treating the crane...
Factory of the Future: Industry 4.0 and Data Integration<br/>
Industry 4.0 extends far beyond robotics and cloud networks; it ensures that...
Plant Layout Design Guide: Knuckle Boom Jib vs. XY Rail System<br/>
The single greatest error in assembly line planning is treating the crane...
Read More
Official Partner
As part of our strategic partnership with Eepos GmbH, the global leader in aluminum rail systems, we manage the entire process from engineering to installation with our expert team, delivering turnkey aluminum rail crane systems designed to boost your operational efficiency.
Meet smart
handling now.
Let us analyze your material handling process on-site to determine together which system will meet your needs with maximum efficiency. Simply fill out the contact form to get a quote or request a site survey.